Welcome
to the fifteenth edition of The Eureka Times. Well folks, as I write this edition of The Eureka
Times I am suffering a bit from jet-lag having arrived this morning from a visit
to the factory in China. For a number of reasons this was a most successful
visit not the least for the project up-dates received which are covered in this
edition. The CPH/CTH NSWGR rail motor set. All modifications on the CPH/CTH are now complete,
art work is at the factory and we are waiting for paint samples after which
final assembly will be completed. We
expect to have painted samples by the end of May and have been told to expect
delivery before September.
The art work for the CPH/CTH rail motor sets is show
below. The numbers that will be available are as follows: Tongue and Groove siding cars with crown lights.
Masonite Siding
The above combinations are not exactly the same as
those previously advised so if your original choice is not here or if you have
not previously advised your preference please let us know now so that we are
ready when the models arrive. Some
of the liveries are being ordered in small quantities only so if you have a
special preference please advise us now. |


CPH and CTH in Indian Red with Yellow Lining on masonite siding.
More livery examples will be uploaded within the coming week.
|
The LCH/CCH and CHG Trainpaks This project is nearing
completion. The final pilot model for the CHG has been approved and minor
corrections to the LCH/CCH pilot models are currently being carried out after
which they also will be ready for production. Art-work
is now finalised and the factory has advised us to expect delivery before
September. In addition to a choice between ten packs of LCHs and CCHs, a mixed
pack of five LCHs and five CCHs will be available. At least five sets of numbers
will be available for a total of 50 different numbered vehicles.
CHG vans will be
available separately at a cost of $49.95 each plus $5 postage. The C38 We
have been agonising over a major modification to the fire-box of the 38 for some
time and recently we decided to bite the bullet and instructed the factory to
carry out the modifications. This dilemma is one often encountered in a project
as we are faced with the choice of making modifications which will result in a
more accurate model but will add substantial additional costs to the project and
push back the delivery date by several months. In the end we
here at Eureka inevitably go for accuracy and live with the delays and extra
costs. The
factory informed us this visit that we should expect to receive the first test
shots for the 40 class in June. This caught us a little by surprise, as this
project at this stage is proceeding on time. We have therefore initiated
preparation of the art-work and are arranging for production of the sound files
with QSI. If all these activities go according to plan we should see the 40s in
late 2008 or early 2009. The R Class The K class As previously stated the second locomotive in our VR collection will be the K class, it is intended to starting tooling no later than July this year to provide for a 4th quarter 2009 delivery. It would be preferable if there was a break of around twelve months between the R and K class delivery dates but we do not wish to delay the K class any further and so we will be asking the factory to place the K in the next vacant slot in their tooling program. Order forms for the K will be included in the next issue of The Eureka Times. Work on the next two VR projects has commenced and we are currently examining several other VR rolling-stock projects. More details in the not too distant future. The AD60 Stocks
of our AD60 are starting to get very low particularly sound equipped models due
to a continued healthy local demand for the AD60 (Thanks folks). At the same
time our overseas sales are expanding due to our growing number of overseas
retail outlets and stocks are expected to be exhausted by October. The 620/720 2 Car Diesel. Stocks
of this model are almost exhausted. We have sound equipped units in tuscan red
only and a few non-sound weathered units left. We also have a small number of
un-numbered units in both non-sound and sound equipped models which we are
letting go at $325 for the non-sound units and $425 for the sound equipped
units. 900 class DEB set: This
project was one of the major topics of discussion at our recent visit to the
factory and we are looking at a mid to late 2009 delivery. We will announce full
details including price shortly. The HUB sets: This project was also a major topic of discussion on our last visit to the
factory and we are awaiting a final quotation after which full details including
prices will be announced. A late
2009 delivery date is also expected. The 59 class: The
drawings for the NSWGR 59 class are being finalised at the moment with tooling
to start in the second half of 2008. We
expect to announce full details of this project next issue. Thanks for clearing that up, Donald. Former US
Secretary of Defence, Donald Rumsfeld when recently asked to comment on delays
in the delivery of Eureka Models projects (and in those of our sister
organizations who also commission projects with manufacturers in China) offered
the following observation: Thanks Donald.
There are about a dozen other projects on which work has started but which have not yet reached the stage where there is much point talking about them. These will round out the Eureka program and we will progressively add them the above list at the appropriate time. |
Ron
Cunningham
EUREKA MODELS
PO Box 407 SANS SOUCI NSW 2219
Phone: (02) 9529 2235 Fax: (02) 9583 1570
Email: eureka.m@bigpond.net.au